Thanks for all the responses thus far. In general would it be key to double up the floor joists under the room, or the 3/4" plywood screwed? Is it imperative for both? I am just asking in case the builder comes back unable to do it for the cost allocated. Should I request that rather than the double layer of drywall, or keep that as well.
The mention of the 2x6 had my thinking the walls were relatively thin on the innerwalls, perhaps 2x4 (if they go that small for inner wall) I am not positive on the house being framed that I walked through. I will have to drive over tomorrow and take a look again.
Is there an order of importance of what is "key" ?
Thanks for all the links too... some reading to do now.
The mention of the 2x6 had my thinking the walls were relatively thin on the innerwalls, perhaps 2x4 (if they go that small for inner wall) I am not positive on the house being framed that I walked through. I will have to drive over tomorrow and take a look again.
Is there an order of importance of what is "key" ?
Thanks for all the links too... some reading to do now.