I would be happy to answer your question about shipping. Just email me and I can tell you delivery schedules on specific orders.
We began manufacturing the PurePower+ product line in September after a 6 month beta program. As we discovered it is no mean feat to design a brand new product release, build a new production facility, set up a complex supply chain and make certain the product meets all your expectations. We think we have accomplished all of that, and our reliability experience is dramatically better than our past outsourced product. The one thing we have not yet accomplished is to build them fast enough to meet demand. Nevertheless we do not currently have long lead times on delivery and production is steady and steadily increasing.
PurePower+ models are being hand built in our Canadian plant and we have absolutely no plans to outsource our production to Taiwan in order to speed production. We learned that lesson the hard way.
We began manufacturing the PurePower+ product line in September after a 6 month beta program. As we discovered it is no mean feat to design a brand new product release, build a new production facility, set up a complex supply chain and make certain the product meets all your expectations. We think we have accomplished all of that, and our reliability experience is dramatically better than our past outsourced product. The one thing we have not yet accomplished is to build them fast enough to meet demand. Nevertheless we do not currently have long lead times on delivery and production is steady and steadily increasing.
PurePower+ models are being hand built in our Canadian plant and we have absolutely no plans to outsource our production to Taiwan in order to speed production. We learned that lesson the hard way.