Good Morning...
@lak
Good question as we are very late with this product.
We decided to put our resources into getting the EQUI=CORE 1200/1800 out first. We wanted to more flesh out this part of our line.
The Power Core is basically done - just new metal to complete the final look so that it falls into line with the rest of our products.
Now that E=C 1200/1800 is about to ship - I will turn my attention to this and get it done. Perhaps 4 to 5 weeks max.
Many thanks,
Mark
BTW - we still believe that Balanced Power is the primary method for better sound - this is step one for sure.
@lak
Good question as we are very late with this product.
We decided to put our resources into getting the EQUI=CORE 1200/1800 out first. We wanted to more flesh out this part of our line.
The Power Core is basically done - just new metal to complete the final look so that it falls into line with the rest of our products.
Now that E=C 1200/1800 is about to ship - I will turn my attention to this and get it done. Perhaps 4 to 5 weeks max.
Many thanks,
Mark
BTW - we still believe that Balanced Power is the primary method for better sound - this is step one for sure.