I plan to install a Generac whole house after the disaster here in Texas and will be digging down with the same electrician that installed the subsystem I use to power the hi-fi, which is essentially a 60 amp feed from the main service entrance to a sub panel that goes into a 10kVA iso transformer and routes via 4 gauge to a sub panel dedicated to the system and from which are pulled dedicated lines.
I have no interest in playing the system during any electrical back up period, but the Fremer experience was brought to my attention. Given that virtually all this electrical equipment is outside in close proximity to the service panel (no basement, just pier and beam construction), it should be possible to route this back up in a way that does not involve the switch but I'm not an electrician and haven't thought this through yet, let alone met with the electricians to discuss it. I had a terrific experience with them in installing the above described subsystem-- mainly commercial contractors, they really knew their stuff. I haven't focused on this yet, but if anybody has any thoughts, I'd certainly welcome them. Sorry to piggy back on your thread, @deadlift .