All, yesterday, at approximately 430 hours of playing time plus 60 hours of low-level operations, the M925 amps were showing signs of musical grandness as well
as of some
residual break-in growing pains.
The Dvorak 9th Symphony 2nd movement under Bernstein and the Israel Philharmonic is magnificent: size and clarity of staging, imaging, speed and fullness
of macro transients, authority
. The lower brass fanfares are not only powerful and harmonically complex, but are heard inserted into the living context
of the 3D stage, rather than a musical object without spatial references
I know I said this before, but the reality is that these effects keep growing
in perceived size, complexity, and sheer emotional impact.
The massed upper and mid strings are not only textured and sweet, but resolve into the bowings of the individual fiddles and violas. The flutes have an
ethereal beauty, while the English horn keeps enhancing the multilayered earthiness to its melancholic sound. The chamber-like section toward the end of
the movement is assuming delicacy, detail, harmonic richness, and a filigreed transparency that are enchanting....
However, we may have a little temporary break-in tantrum
The mid bass has lost a bit of power and resolution, while manifesting some signs of wooliness...
I could hear the anomaly in the introduction of the Dvorak sextet with double bass, in the plucked electric bass of Diana Kralls Temptation, and in a slight
uncertainty of the string bass line of Dvoraks 9th, particularly the plucked sections... The bass anomaly could also be heard in a certain lack of vicerality
in the midbass of Bach's toccata, adagio and Fugue in C minor performed by Wolfgang Rubsam on Naxos redbook. Interestingly, the minor emotional disorder
does not affect the deep bass: the lowest bass notes in the adagio movement remained visceral, pitched, and harmonically textured.
Today I powered down the whole system including amps, and disconnected all components from the AC for four hours, so to recycle charge on all capacitors, transformers, etc
. I will log my next report at the end of the month, close to the 600 hours mark.
Saluti, Guido