I plan on having the entire outside cable run plus meter lid replaced. The cable from meter to service panel was inspected and is ok.
Service panel is an older unit, the previous owner had about 80% of branch circuits replaced. It's easy to spot these...new breakers and cables. The old wiring runs to low current draw areas such as bedrooms, light fixtures. I had my electrician strip wires and organise the panel to keep an even load on each leg.
I extended the service to include a subpanel with (2) 20A lines, 12/2 Romex, hospital-grade duplexes.
8' ground rod off main panel with second ground rod from subpanel. Most of the homes are grounded to plumbing.
I plan on having the entire outside cable run plus meter lid replaced. The cable from meter to service panel was inspected and is ok.
Service panel is an older unit, the previous owner had about 80% of branch circuits replaced. It's easy to spot these...new breakers and cables. The old wiring runs to low current draw areas such as bedrooms, light fixtures. I had my electrician strip wires and organise the panel to keep an even load on each leg.
I extended the service to include a subpanel with (2) 20A lines, 12/2 Romex, hospital-grade duplexes.