millercarbon8,881 posts04-24-2021 3:51pmYour contractor is nuts. You want the cryo wire. You do not want it in conduit. You are willing to come string it through the holes in the middle of the night if that is what it takes. Etc, etc.It could actually be that the contractor wants to stay in good graces with the local code enforcement dept. Ever think of that little detail? Just because someone is willing pay to violate local codes to prevent a potential building fire, doesn't mean a contractor should do it.
Dedicated AC line - Contractor wants to use BX instead of romex
Any thoughts on this?
Also I was planning on wiring the end of the run with an 20 Amp IEC connector so I could plug it directly into my Niagara 7000. I don’t know if they will wire it this way but I thought I could always do that myself later.
- ...
- 52 posts total
Bravo for your support of actual science.👏👍 |
I was only joking about the 50k . For starters the best thing if your swapping your panel out is get the panel with the silver plated buss then run a dedicated 20A thats 10/2 or 2 , when I ran my dedicated outlet since I was running 1 I just ran 2 so i have 1 20a for my surge and another for my Subs I have dual subs so im using both outlets for the subs , overkill I know but , before I did all this I got major sag on the line lights were dimming bad so I knew I needed a dedicated outlet . and the first outlet that has the surge protector on it the second outlet I have a IFI AC purifier in it so all 4 outlets are being used |
- 52 posts total