life expectancy of a cdp?


I am looking at a used Parasound cdp. I know that it is based on amount of use , but on average how long should a unit last, and what amount of maintance is required? I read in other threats about the laser having to be serviced in some units.
Gary
garypic
Hi Trelja,

I think the consonance now uses philips transports. Mine played up in the consonance cd120 linear after 6 months. They replaced the transport with I think a philips no problems since.
Cheers,
Steve.
Sony 608es from 1989 stills works perfect in my secondary system.
Sony X77es still works perfect, used as a transport average use would be in excess of 3000 hrs per year.
Hello, Steve!

The Droplet is the only Consonance to currently use the Philips. Along those lines, it is the only Consonance player not to have laser assembly worries. The first generation of Droplets used the Sony, and had LOTS of problems. What is interesting is that if you read the review, you can see that even the review sample that won the 6moons.com Blue Moon Award was having issues during the review. Truly a harbinger of the future.

Apart from the Reference 2.0 SACD player which used a Sony SACD assembly (good thing, as I hear the Philips SACD assemblies are as just as horrible as the Sony CD assemblies), the older Consonance players, including the initial iteration of the CD120 Balanced, were Philips. They fail once in a great while. Since they are front loaders with a drawer, once they fail, you have a nice doorstop as the company does not support them. All CD120 Linear players use the Sony CD transport.
Here's the management design cycle of a product:
1. Manager starts new project and pushes engineers to develop the product on time and on budget.
2. Manager transfers to a new project before the testing is completed which will require redesigns and cost increases.
3. New manager takes over the project and pressures engineers and manufacturing to reduce costs in the design, the parts and the manufacturing process. Manufacturing is outsourced overseas to maximize profitability.
4. Manager transfers to a new project before the warranty costs start coming in .
5. New manager takes over the project and pressures engineers and manufacturing to improve quality of the product without adding cost.
6. Product sales drop off due to poor reputation. Management starts the product design cycle over using the previous bad design as the starting point.
Post removed