I heard from my electrician and all is good. I copied the instructions posted by @jea48 and @almarg and sent an email. He said that the additional wiring of the new panel matches jea48's information. One exception is that he believes the 2nd grounding rod should come from the subpanel, rather than 2 rods from the main circuit box. (new code requires 2 ground rods per residence).
So, Jea and Al, thank you again for the time you spent dealing with this issue.
@cleeds ,
As far as permits, I saw the law that you posted, and I know it applies to construction or an addition to a residence, but my neighbor and I both have had electrical and plumbing work performed without a permit from a licensed contractor.
So, Jea and Al, thank you again for the time you spent dealing with this issue.
@cleeds ,
the project wasn't inspected by a city official before it was put into use.Inspection is done at the time a house is being sold during the closing process; Title search, Home Inspection, and Pest Inspection are required. The buyer may use an attorney or a realtor for the closing process and must hire the certified building inspector.
As far as permits, I saw the law that you posted, and I know it applies to construction or an addition to a residence, but my neighbor and I both have had electrical and plumbing work performed without a permit from a licensed contractor.