@cycles2 ,
I gave the interconnects 3 days before putting in the the SCs and PCs. I can report that there was a significant jump in quality using just the ICs and they weren’t even close to being burned in.
once I introduced the other cables into the system there was no way to tell which Cable was doing more. I have another loom of cables coming for a second system. I will try to be a little more scientific this time and eliminate the variables.
I gave the interconnects 3 days before putting in the the SCs and PCs. I can report that there was a significant jump in quality using just the ICs and they weren’t even close to being burned in.
once I introduced the other cables into the system there was no way to tell which Cable was doing more. I have another loom of cables coming for a second system. I will try to be a little more scientific this time and eliminate the variables.