@elizabeth ........ Sounds like you have a good plan going on.. I am still burning in my first of my 3 Furutech GTX D-Rhodium duplex on my Ref line. Top and bottom each 15 days burn in time. I have about another week left for the first on to be burned in and then i will move to the 2nd. And then the 3rd . 3 months total for the 3. Then i will install one with the Oyaide carbon fiber cover and the other 2 with the WPZ -Z 2 dual duplex Oyaide carbon fiber . I will be using one with my Rega Isis cdp and my other 2 with my ARC Ref 6 And Krell FPB 600. That will be on the duplex.
- ...
- 321 posts total
- 321 posts total