millercarbon ...
Sorry, no.
A couple of things ... First, this home was damaged in our last bout of fires. During the repairs, it had a brand new circuit breaker box installed. Its a large custom home with a bazillion switches in the box. Plus, there were two sides to the box with no room in the side with all of the switchs. So ... we had to feed the wires through the side box containing the mains, into the side with the switches. No problem there as it all went smoothly. Just took extra time, is all.
We were pressed for time, so we listened prior to installing The Gate, and then again for about a half hour after installation. Then, we ran out of time and had to leave. It was a very noticable improvement right from the start.
My friend will post some of his thoughts in a few days or so, after giving The Gate a chance to fully saturate the home circuits.
Frank