the lens seem to be a very cool device but pricey when everything is added up..
lens $400 (used)
cables $350 (used orchid, need one more with the lens)
power cord $250 (used audience)
comes in at a extra $1000 (estimated)...so would the $1k be better served by adding the lens or by adding/upgrading the transport clock ?
has anybody gone this route before ? the bummer with upgrading the transport, you lose the roi when you sell vs good roi recovery of selling the lens & cables..
lens $400 (used)
cables $350 (used orchid, need one more with the lens)
power cord $250 (used audience)
comes in at a extra $1000 (estimated)...so would the $1k be better served by adding the lens or by adding/upgrading the transport clock ?
has anybody gone this route before ? the bummer with upgrading the transport, you lose the roi when you sell vs good roi recovery of selling the lens & cables..