@output555 - I hear you, it is a question of spending money on electricians and dealing with what may be system wide (power not just hi-fi) issues.
@mikelavigne - not being one for watching long videos (nice plug for Rex though), did Fremer do a splitter on the power after the meter to feed the system panel directly and then, on the other stem, run the transfer switch to the main household panel so the ATS is not connected at all to the hi-fi?
did Fremer do a splitter on the power after the meter to feed the system panel directly and then, on the other stem, run the transfer switch to the main household panel so the ATS is not connected at all to the hi-fi?
@whart ,
Go to time marker 11:23.
A feed through 200 amp main service panel with a 200 amp main breaker was used. Note the lugs installed on the two hot buses near the bottom of each bus. Those lugs feed the utility power to the ATS. FYI, this is a Square D QO factory built UL Listed panel.
For the audio room sub panel a single pole breaker is plugged on to one of the two Hot buses to feed the 120V only sub panel.
Note the electrical inspector made the electrician rework the feeder wiring to the sub panel. The electrician had to install the other Hot Line, conductor, (not hooked up), for future use if the panel was ever reworked for single phase 3 wire 120/240V.
I don’t think that is required by NEC. But the AHJ has the final say. It could be a requirement there...