I n my present listening environment, I have a Robust Design for a Cantilever Wall Mount Shelf that is set up to be used.
This can take substantial weight. I have used it with a Tiered Sub Plinth Set Up built of it and also have had a Sub Plinth Suspended from it.
Either of these methods have presented quite similar, their are small differences, as is always the case when a variant of a Support Structure is produced.
Due to Source Equipment Security concerns the Cantilever has not had the weight loaded in a manner I usually put in place on top of a Rack Structure.
The Cantilever Shelve is used for the Digital Source and the Rack is used for the Analogue Source.
When creating the Structure under the Rack, producing methods for the Bracing of the Rack (dense foam as separator and tension strap the Racks together), along with the methods used to produce the TT Supporting Structure above the Racks Top Shelve. The assembly has proved to be very good for creating interesting discoveries and continued reconfigurations of the Structure has really honed the presentation to one I do not want to be without.
The Racks come with a cost, but it is bespoke produced for me by a now deceased friend who's hobby was wood turning. Footers are going to cost varying sums of money, there is a need to Spend that is difficult to avoid or Clone, this will be needed if the better experiences are to be had through using certain types of footer. The combined cost of all the materials and footers collected over quite a few years is probably less than a £1000, the recent acquirement of Densified Wood Board has been £500, but I do see more of this to be purchased as it has impressed so much. For me, I have paid to learn a variety of lessons, certainly not the type of monies a dedicated Isolation Platform will command. I have been hands on, enjoyed the curiosities and thought processes used, the monies have been well spent in my view.
What is the outcome of working with the different interfaces that can be produced as a equipment support and for the management of energies thar are being transferred. For me the system that commenced being built approx' 20 years past and much of the early acquired devices that remains in use, is a keeper.
The system mounted on a well thought through structure has enabled me to have identified items used in the system that are in my assessments functioning as constraints.
The more recent choices made for the replacements of items recognised as constraints are pretty much showing to me, the system as built over many years is a superb experience and a is to be kept.
Run parallel with this the non-EE Skilled interfaces that can be put in place and there is something very special to be achieved. I certainly don't consider needing new anything at a get on board fee of $5k, 10$ or up to $50K, I have demo'd A/B against items up to these values, and am not feeling there was something amiss from my end.