Recently new power poles were put up on my street by contractors of the power company. The 3 7300 vac lines were raised to the top of a new pole. I asked if the same transformer was going back in place; they said yes. I asked if an additional transformer could be mounted for my house. They just said, “Sure!” So they mounted an additional transformer just to my house, tapped into the lesser used of the 3 phases. My cable coming into my house from the transformer went into a tree; so I asked if that could be replaced to clear the tree, since they had raised the transformer 10 feet and couldn’t cut down the big oak tree that was now interfering. They said YES!! They doubled my cable gauge, and re-routed it. Took me off the grid an hour. But now I have my own transformer and heavy cable servicing the house. I have 2 dedicated lines from the trunk line feeding my sound system. 8 gauge stranded on each circuit. 30 amp breakers on each circuit. 4 600 watt mono block amps.