I just read my post above, and let me clarify further that these are the chrome screws that are on the very top of the box.
VPI balanced junction box installation
I was wondering if anyone has installed a balanced junction box on a VPI arm. I have the 10.5i and just got the new box in the mail. I can tell there are two screws/bolts holding the single ended box on but the holes are so deep I can't see what they are without turning it upside down. I'm trying to do this without moving the table (SSM) because I've got it leveled already and just kissing my rim drive. Can anyone tell me what type of tool I need to get the single ended box off? I could call VPI of course but they're not open on weekends and this is when I have the time...maybe.
- ...
- 11 posts total
- 11 posts total