From a builders perspective, you are on a road towards disaster with that plan. Concrete is extremely heavy and needs to be engineered and built with steel rebar to be self supporting with a load. This is not the kind of thing you do with wooden joists incorporated
in all probability, your floor is fine since it is already over engineered from what i can tell. Two layers of 3/4 plywood is not normal procedure. If you have I-Joists, they are very rigid also.
in all probability, your floor is fine since it is already over engineered from what i can tell. Two layers of 3/4 plywood is not normal procedure. If you have I-Joists, they are very rigid also.