My solution is simple, I use PVC water pipe, suspended under my foundation and hide every cable in the system till it rises from the hole in the floor and connects to the equipment.
This should be possible with any pier and beam foundation home and my best friend used this idea with his slab foundation. He had grooves cut in the concrete for the PVC before the hardwood floor was laid.
Those building a new home could easily have the contractor set the PVC in the foundation before the concrete pour.
If you cannot hide them as I suggest, several of the above comments are sensible solutions to covering them up.
This should be possible with any pier and beam foundation home and my best friend used this idea with his slab foundation. He had grooves cut in the concrete for the PVC before the hardwood floor was laid.
Those building a new home could easily have the contractor set the PVC in the foundation before the concrete pour.
If you cannot hide them as I suggest, several of the above comments are sensible solutions to covering them up.