I'm confused about the second (set) ground rod for the 2nd panel issue. I'm familiar with installing two ground rods and connecting to the main panel. Sometimes a second panel (subpanel) is installed on a 2nd floor of a house for circuits in a bedroom, lights, etc... so are people suggesting we run a ground wire outside from there and connect it to a ground rod (or two)?
A sub panel connection has different rules than a main panel.
A sub panel connection has different rules than a main panel.