lowrider57
Tying the neutral and grounds together at the main panel is required by code and helps prevent ground loops.
If the subpanel (containing breakers for 2 lines) takes a feed of hot, neutral, and safety ground from the main panel, are these 2 new lines truly dedicated?Yes, that is how a subpanel should be wired. Provided that the lines go directly from the subpanel to the receptacle used by the components, those are considered dedicated lines.
IOW, by tying in to the main panel (which may have shared neutrals and grounds), is there a chance of causing a ground-loop in the new lines originating from the subpanel?
Tying the neutral and grounds together at the main panel is required by code and helps prevent ground loops.