At this point in time (June 2019) I wonder if anyone knows if there is still a big backlog of 20.7 orders, and thus still a 20.7 waiting list?
I live in the Minneapolis metro area, where we have a single dealer for the whole state. I was told the dealers are allocated 1 pair of 20.7 speakers per 20.7 manufacturing cycle, which I gathered was maybe 3-4 times per year? The dealer said they order 1 pair of 20.7 per manufacturing cycle and by the time that pair is manufactured, they have been sold to a customer. Thus, they never have a pair of 20.7 on the demo floor.
I would guess that if the dealer is only able to order/sell 3-4 pairs of 20.7 per year, a customer would end up in a waiting list that could be 12 months long or more?
Would there be any time advantage in ordering direct from Magnepan, and sidestepping the wait list that the dealer likely has?
Thanks for any insight.
I live in the Minneapolis metro area, where we have a single dealer for the whole state. I was told the dealers are allocated 1 pair of 20.7 speakers per 20.7 manufacturing cycle, which I gathered was maybe 3-4 times per year? The dealer said they order 1 pair of 20.7 per manufacturing cycle and by the time that pair is manufactured, they have been sold to a customer. Thus, they never have a pair of 20.7 on the demo floor.
I would guess that if the dealer is only able to order/sell 3-4 pairs of 20.7 per year, a customer would end up in a waiting list that could be 12 months long or more?
Would there be any time advantage in ordering direct from Magnepan, and sidestepping the wait list that the dealer likely has?
Thanks for any insight.