As mentioned above don't go through the trouble with a 30A line - run 3 20 A lines instead, labor will be the most expensive part anyway it'll only take a fraction of time longer running 3 lines compared to one.
Run all three from the same side of your panel. Unless you have a very long run 12Gauge Romex will be sufficient.
Good Listening
Peter
Run all three from the same side of your panel. Unless you have a very long run 12Gauge Romex will be sufficient.
Good Listening
Peter