Time/Process of Hooking up New Equipment


Does anyone else ever felt this way?  My new amp arrived with cables and I want to wait until the weekend to hook it up.  I don't want to rush through it after work when it is dark and I am tired - almost rushing to get through it.  I want to make it a longer event and have time to listen to my existing system, then do the work to hook it up (a bit of a pain) and then rest and have time to listen to the new amp.  Maybe stretch out the fun and be fresh on a Saturday morning.  What is everyone's timing / process for installing new gear and the before and after listening?  

12many

Today I pickedup my new audio ethernet swtich and linear power supply on the way home from my 5 hour hike this morning (13.5 miles).  I showered and drank some liquids before I installed it--30 minute delay.  was listening in 45 minutes from the time I walked in the door.

 

@carlsbad 

 

We are on the same page… although I would have done the install before my shower so it could be warming up when I am in the shower. Patients is not my strength.
 

It is always best to tackle any changes to a system with nothing else on the calendar. Plus, if a change involves disconnecting/moving more than one piece of equipment, I literally think through the process beforehand, writing down each step that needs to be taken. To include unplugging power cords and any connecting cables (how many times have you tried to pull something from an equipment stack and realize that it's still plugged in or one cable remains connected?). I rebuilt a fairly complex A/V system recently with 20-something itemized steps written down on my 'cheat-sheet'. Things went smooth as silk.