I agree with uppermid.
Rives Level 1 costs about what you want to spend. You can tell 'em you want to focus on DIY (that's what I did) and then walk through implementing the design one step at a time (I've been working on mine for 18 months and still have one major & one minor project left.
I think you'll get better results this way than hit or miss design/matching/products.
Rives Level 1 costs about what you want to spend. You can tell 'em you want to focus on DIY (that's what I did) and then walk through implementing the design one step at a time (I've been working on mine for 18 months and still have one major & one minor project left.
I think you'll get better results this way than hit or miss design/matching/products.